Contract for the equipment of 6 Waste Water Treatment Plant


CMR signed a Contract with the Engineering Company BONNA for the supply of the Instrumentation of 6 new Waste Water Treatment Plant.

 

Object of the contract

The object of this Contract is the supplying and commissioning of an Endress+Hauser Measurement and Analysis Equipment and Spares for the Waste Water Treatment Plant of Haffouz, Oueslatia, Beni Hassen, Chebba, Haouaria, and Metlaoui.

Supplied Equipements

  • Electromagnetic Flow Measuring System
  • Oxygen Measurement
  • pH/Redox Measurement
  • Pressure Measurement
  • Ultrasonic Level and Flow Measurement

Supplying and Commissioning of a Fluxer for the CIOK


CMR ensured the supplying and commissioning of a CLAISSE Fluxer for the Cement Factory of Oum
El Klil.

 

Usefulness of the Fluxer

Fusion consists in the mixing of an oxidized sample with a lithium broate flux. This mix is heated to around 1000°C. At this temperature, the flux melts and dissolves samples to form a perfectly homogeneous mass. Finally, the molten material is either cast to form a glass disk to be analysed by X-Ray fluorescence (XRF), or poured for a rapid dissolution into an acid to be analyzed by Inductively Coupled Plasma (ICP), Atomic Absorption (AA) or any traditional Wet Chemistry method.

 



Avantages de la PERLEUSE CLAISSE
  • Fully automatic.
  • High throughput : 6 samples at a time.
  • 7 perset fusion program available.
  • Consistent flame and temperature control.
  • Low power consumption.
  • Uses propane or LPG gases only.
  • Low maintenance and repair costs.


Supplying and commissioning of a Stabilizer-Dimmer for the Lighting
of the Sports Hall of EL MIDA

 

After noticing the effeciency of the Stabilizer-Dimmer "ILUEST" of SALICRU to save energy, the Municipality of EL MIDA equiped our Sports Hall of an ILUEST of 30 Kva

 

PARTICIPATION IN THE SHOW "SIEL 2005"

 

CMR took part in the 10th edition of the Tunis
International show of Electric and Electronic
Industries "SIEL 2005
".

Range of products:

* Stabilizer-Dimmer for lighting (from 3,5 to
120Kva)
* Battery Charging Units for Industry
* Switch mode dc power supply.
* Static ac/ac Inverters
* UPS
* Electronic Voltage Stabilisers ac/ac
* Electronic Servo-motor Voltage Stabilisers ac/ac
* Central Energy Management

 

This show, was held from 27 to 30 april
2005, it was the occasion for CMR to present
at visitors the complete products range of
it's spanish partner "SALICRU".

 
 

Certification of the Stabilizer-Dimmer of Lighting
by the CETIME

 

After an approbation period from 04/04/2005 to 26/04/2005, the Stabilizer-Dimmer of Lighting "ILUEST" of SALICRU was certified by the CETIME.

This test was realised in the laboratory of the CETIME on a Stabilizer-Dimmer, Three-Phases Voltage, 30 Kva, with display, connected to 20 Lamps SHP of 250W.

The energy consumption was measured by an
"Energy Meter" connected to the ILUEST and
to the lamps.

The obtained result's are :
An Energy Saving of 40%


 
 
New Address
 

CMR changed its offices
New address :
27 Avenue Louis BRAILLE – BP353 – 1002 Tunis – TUNISIE.

 
 
 
   
Certification ISO 9001:2000

Since May 2004, CMR was certified in accordance to the standard ISO 9001:2000 after the installation of a Combined Management System of Quality and Environment.

This system evaluated by BVQI, illustrate the engagement of Continual Improvement System of CMR in order to guaranteeing the perenniality and the success of the company.

" Our ideas must be broad as nature if they are to interpret nature. "
Sir Arthur Conan Doyle
 

CMR, always at the leading edge of progress, consider the respect of the environment as the 21st century challenge and decide to be involved toward human patrimony.
CMR had setting up an environmental management system. This system was evaluated and certified by " BVQI " (Bureau Veritas Quality International) in complete accordance with ISO 14001 standards.
We are very proud to advertice, since september 2003, CMR becomes the first tunisian industrial company being certified ISO 14001: Environmental management system


ISO 14001 : The proof of our engagement
 
 

You can rely on us


Tél. : (+216) 71 739 077
Fax : (+216) 71 788 595
E-mail : cmr@cmr.com.tn

Thank you for the interest which you carry to our
environmental process.

 

Turn Key Package intended for the 2 Power stations of the Tunisian Company of Electricity and Gas STEG in RADES and SOUSSE carried out by CMR

Presentation of the Project:
 

CMR ensured study, supply, installation and commissioning of four SKID package : two at the STEG power station of Rades and two at the STEG power station of Sousse.

  SKID ?
  Physicochemical automat SKID : is intended for the analysis of boiler waters for electricity-producing power station

Usefulness of SKID ?
  The regular monitoring of the quality of boiler waters for steam production is essential.
To guarantee a minimum of checking and preventive and corrective maintenance.
To realize very substantial savings on the level of demineralized water production.
To avoid an attack of copper and iron, because the devastating effects due to corrosion are one of the main causes of an installation forced stop .
The Realization Of The Project :
 

Our team of professionals and specialists has ensured with rigour :

the study, supply, installation and startup of :

In Sousse: 2 SKID, each one includes 8 lines of samplings : temperature exchangers , holder, flow regulator and analyzers intended for the regular control of pH, dissolved O2, Ion Sodium, Conductivity, Silica and Chlorides.
 
In Rades : 2 SKID, each one includes 7 lines of samplings similar to those of Sousse.
The Success Of The Project :
  The 4 SKIDS, are under operation since September 2002, ensuring the monitoring and the protection of these installations.
     
  This success is the fruit of our competence along with the know-how of our foreign partners having world reputation.
     
For more information, please fill in and send this form.  
   
See you in other achievements …